Construction Management & Inspection Services

MEPC was retained as the Engineer of Record to perform a structural integrity inspection of a landmark windmill located in Oakdale, NY which was found to be structurally unstable, and ultimately resulted in the demolition of the windmill structure.
The Principal of MEPC was the Engineer of Record for the Tommy Hilfiger Reimaging Project, and Structural Modifications to the Mezzanine Extension at the Jones Beach Amphitheater located in Wantagh, NY.
MEPC was the Engineer of Record for the Stage Widening Project at the Tweeter Performaning Arts Ctr. located in Mansfield, MA. The project required (2) new 11′ x 16′ PC reinf footings, 16″ & 10″ Tube steel Columns with W36x280 support structure.